Our bathroom remodeling process

Work directly with Raymond from your first estimate to the final walkthrough.

  1. Start with a free in-home estimate

    Show Raymond what you’d like to change. He’ll take measurements and talk through whether you want a full bathroom remodel, a tub-to-shower conversion, or an update to just the tub or shower area.

  2. Agree on the scope and schedule

    Review the written estimate, choose your finishes and fixtures, and confirm what’s included and when work can start. Ask whether your project qualifies for a two-day turnaround. Timing depends on the scope and what we find after removal.

  3. Prepare the space and install

    We protect the work route, remove the fixtures and finishes included in your estimate, and check the exposed areas before installing the new materials. If we uncover something that changes the work, we’ll discuss it with you before moving ahead.

  4. Walk through the finished room

    We clean up and review the finished work with you. We’ll go over any care instructions and answer your questions before we wrap up.

Protecting your home

Before demolition, we lay protective runners and drop cloths along the route to the bathroom and cover nearby surfaces, such as a vanity that’s staying. When space and weather allow, we set up a worktable outside to keep tools and materials out of your living space.

Drop cloths across the tiled entry and adjacent carpet
Floor protection from the entry
Stairs and the landing covered with protective cloths
Stairway protection
Protective cloth draped over the bathroom vanity
Vanity covered before work begins

Opening the walls down to the studs

For a tub or shower replacement that calls for it, we remove the old unit and take the surrounding wet-area walls down to the studs. This lets us see the framing, subfloor, and plumbing before we build the new tub or shower area.

Old tub still in place with the wall finishes removed around the window
Old tub surround during removal
Exposed wood studs and subfloor in a windowed tub alcove
Framing exposed after tub removal
Open wall framing and exposed drain piping in another bathroom alcove
Open alcove before installation

Adding support behind the shower walls

We confirm where you want accessories such as grab bars or a fold-down seat. While the walls are open, we add wood backing between the studs where needed so those accessories have solid mounting points behind the finished wall.

Horizontal wood backing fitted between exposed studs in a shower wall
Wood backing between the studs
Wood backing visible on the open back and side walls above a new shower base
Backing in place before wall finishes
Finished shower with a horizontal grab bar and a wall-mounted fold-down seat
Grab bar and seat after installation

Inside a herringbone floor installation

See how one bathroom floor went from an exposed subfloor to a finished herringbone pattern.

Exposed plywood subfloor with two pieces positioned to start the herringbone layout
Subfloor prep
Marble-look flooring laid out in a herringbone pattern before the perimeter pieces are fitted
Layout in progress
Completed marble-look herringbone bathroom floor viewed from the doorway
Finished floor